Concrete flatwork around a metal building means the aprons, walks, ramps and pads outside the main slab. Good flatwork drains away from the building, meets the overhead door at the right height, and has joints placed to control cracking. Share the areas to be poured, their approximate size and how vehicles will use them.

Aprons at overhead doors
An apron is the paved area in front of a large door. It should slope away from the building and be thick enough for the vehicles that cross it, so mention trucks or equipment up front.
Sidewalks and walkways
Walks connect parking, doors and outbuildings. Width, slope and a non-slip finish matter more than appearance when the path stays wet or gets dusty.


Ramps
Ramps for carts, mowers or wheelchairs follow slope limits that depend on use. State the use so the grade can be planned to suit it.
Bollards at doors and corners
Bollards protect door frames and corners from vehicle strikes. Placement depends on how vehicles approach, and the footings need to be set before the concrete around them.


Control joints and sealant
Joints guide where concrete cracks as it cures and shrinks. Sealant in the joints keeps water and debris out, and it needs periodic inspection.
Repairing cracked or settled flatwork
Settling often traces back to poor drainage or soft subgrade. A repair that ignores the cause tends to fail again, so ask what is being done about water.

What to share for a flatwork estimate
- Areas to pour and rough dimensions
- Vehicle weights that will cross them
- Where water currently runs
- Finish preference, broom or smooth
- Connection to an existing slab if any
Flatwork questions
Is flatwork part of the building slab?
Usually it is a separate scope. Ask whether your estimate includes the outside pads or only the building floor. The slab page covers the floor itself.
Why does concrete crack?
Concrete shrinks as it cures, so cracks are expected. Joints make them happen in planned lines.
How thick should an apron be?
It depends on vehicle weight and soil. Describe the heaviest vehicle and let the design set the thickness.
How soon can I drive on new concrete?
Wait for the cure time the finisher recommends, which is longer in cold or wet weather.